1. The substrate must be treated before spraying, requiring no rust, no oil, keep clean and dry.
2. The product is two-component system, stir slurry first, add curingagent according to the proportion,aging 30 minutes after stirring well. 3. With special thinner to adjust the construction viscosity, according to the amount of paint, the paint should be used within 8 hours. 4. It is recommended to spray two times, each dry film thickness of 355 u m, require the construction interval more than 20 minutes. 5.For grinding,the temperature need tobe higher than 15C,dry about 24 hours.